
Project Name | Heilongjiang Heihe huma TV studio | Project Introduction | One main screen on the front and one ear screen on both sides. |
---|---|---|---|
Project Date | 2021.03 | Equipment used | KS9000,Kommander F2,ES4*9,G612C*138 |
Project Location | Heilongjiang | Project Requirements | 1. The project uses 4K splicing of graphics card, which requires point-to-point display and smooth large screen playback without jamming. 2. Using high brush chip, through the debugging of kaishida software, 3840 refresh is achieved, the picture output i |
View all cases
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Bright investment wisdom City some exhibition center
Project Name:Bright investment wisdom City some exhibition center
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:LED screen 1 L type 1536* 2432,12 LCD, 1 projection, 2 audio, HDMI to SDI converter
-
An exhibition hall in Hangzhou
Project Name:An exhibition hall in Hangzhou
Project Date:2020.07
Project Location:Hangzhou, Zhejiang Province
Project Introduction:P1.53 Small spacing immersive experience hall
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Hangzhou 5G exhibition hall
Project Name:Hangzhou 5G exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:The screen is a movable telescopic screen
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Sichuan Yibin international bamboo products trading center
Project Name:Sichuan Yibin international bamboo products trading center
Project Date:2021.04
Project Location:Yibin City, Sichuan Province
Project Introduction:One computer controls three screens
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen