Project Name | Jiahong revitalization Center | Project Introduction | 1. The three screens display different images respectively 2 p1. 58 small spacing screen |
---|---|---|---|
Project Date | 2021.08 | Equipment used | SV16、G616*55、MF630 |
Project Location | Dongguan City, Guangdong Province | Project Requirements | 1. 1 computer for centralized control; 2. Smooth playback without jamming, clear and smooth picture quality; 3. Automatic control screen opening and closing time. |
View all cases
-
Rongchuang West Bay exhibition hall
Project Name:Rongchuang West Bay exhibition hall
Project Date:2021.08
Project Location:Xi'an City, Shaanxi Province
Project Introduction:2.5 sand table screen, large screen number 7752 * 4352
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Exhibition hall of bonded port area
Project Name:Exhibition hall of bonded port area
Project Date:2020.12
Project Location:Ningbo City, Zhejiang Province
Project Introduction:1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display.
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front
-
Beijing army aviation academy
Project Name:Beijing army aviation academy
Project Date:2020.01
Project Location:Beijing
Project Introduction:P3,4608×832