

Project Name | Guizhou Xishui Junpin international KTV tree screen | Project Introduction | Indoor P4 soft module to assemble a tree screen |
---|---|---|---|
Project Date | 2021.06 | Equipment used | LS2、G612e*51 |
Project Location | Zunyi City, Guizhou Province | Project Requirements | 1. Use one computer for centralized control and play smoothly without jamming; 2. Modules in irregular places need hub port offset. |
View all cases
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.
-
Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Name:Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Date:2021.09
Project Location:Shantou City, Guangdong Province
Project Introduction:The project site uses 85 sets of 5 large magic cube screens + 55 sets of 5 small magic cube screens, with a total of 140 ceiling magic cube screens.
-
Shougang international qinhuangdao logistics base
Project Name:Shougang international qinhuangdao logistics base
Project Date:1970.01
Project Location:Qinhuangdao
Project Introduction:Full screen 22 transparent screen, need full screen display screen, shooting effect is good.
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.11
Project Location:Tibet
Project Introduction:Front main screen top ring screen four perimeter strip screen spherical screen in the sky screen.
-
Hefei Miko KTV
Project Name:Hefei Miko KTV
Project Date:2022.04
Project Location:Hefei City, Anhui Province
Project Introduction:Corridor screen, private room ceiling, wall modeling screen, strip screen and vertical strip screen
-
Hubei enshi Athena bar
Project Name:Hubei enshi Athena bar
Project Date:2020.01
Project Location:Enshi
Project Introduction:
-
Miami bar in Peixian County
Project Name:Miami bar in Peixian County
Project Date:2020.12
Project Location:Xuzhou, Jiangsu
Project Introduction:One main screen, one DJ console, six auxiliary screens, thirty-six box screens and five vertical screens
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Nine door screens and one canopy
-
Luohu Huarun Mixc City
Project Name:Luohu Huarun Mixc City
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:Indoor P2 project, ring screen