Project Name | Guizhou Yinjiang Mushang KTV | Project Introduction | 1. P4 door head M-screen, P4 screen in large compartment |
---|---|---|---|
Project Date | 2022.03 | Equipment used | LS6,LS4,G612C*58 |
Project Location | Tongren City, Guizhou Province | Project Requirements | 1. The picture is clear and smooth without dislocation. 2. The compartment is loaded with a processor, and the sky screen and the main screen are displayed in the center. 3. Adjust the misaligned part of the door head screen to make the screen display c |
View all cases
-
Guangdong Yangjiang bar
Project Name:Guangdong Yangjiang bar
Project Date:2021.05
Project Location:Yangjiang City, Guangdong Province
Project Introduction:1. There is a main screen on the front and a DJ Table 2 Two ring screen 3 Long screen around.
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2 A curved front uses two projectors 3 Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.
-
Nanshan museum
Project Name:Nanshan museum
Project Date:2018.06
Project Location:Shenzhen
Project Introduction:P3 project, tree project, whole screen number 1216*1728
-
Shijiazhuang gymnasium, Hebei Province
Project Name:Shijiazhuang gymnasium, Hebei Province
Project Date:2021.01
Project Location:Shijiazhuang
Project Introduction:1. Main screen 4096 × one thousand one hundred and twenty × 2. Strip screen
-
Beijing banana ring KTV
Project Name:Beijing banana ring KTV
Project Date:2021.02
Project Location:Beijing
Project Introduction:This project includes transparent screen module, soft module, outdoor P3 module, 1.86 module, 2.5 module and other multi specification modules. Each compartment adopts the combination of main screen 1.86 module and auxiliary screen 2.5 module. Each compar
-
Guangzhou wake up bar
Project Name:Guangzhou wake up bar
Project Date:2021.08
Project Location:Guangzhou City, Guangdong Province
Project Introduction:P4 screen of the bar, the ceiling and surrounding wall screen.