
.jpg)
Project Name | Guizhou Yinjiang Mushang KTV | Project Introduction | 1. P4 door head M-screen, P4 screen in large compartment |
---|---|---|---|
Project Date | 2022.03 | Equipment used | LS6,LS4,G612C*58 |
Project Location | Tongren City, Guizhou Province | Project Requirements | 1. The picture is clear and smooth without dislocation. 2. The compartment is loaded with a processor, and the sky screen and the main screen are displayed in the center. 3. Adjust the misaligned part of the door head screen to make the screen display c |
View all cases
-
Siping KTV
Project Name:Siping KTV
Project Date:2020.12
Project Location:Siping City, Jilin Province
Project Introduction:The whole KTV has various layouts and special-shaped screens in each box.
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Penglai Space bar
Project Name:Penglai Space bar
Project Date:2020.01
Project Location:Penglai
Project Introduction:Various different screens display 2, P4 modules independently, high refresh, do rotation, with HUB port offset.
-
Xincaichen Nanning (under construction) factory
Project Name:Xincaichen Nanning (under construction) factory
Project Date:2021.11
Project Location:Nanning City, Guangxi Province
Project Introduction:P2-3m diameter ball module, fm6353-5958-40s, nine special-shaped modules, spherical screen, box installation.
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Sichuan Yanting Live House
Project Name:Sichuan Yanting Live House
Project Date:2022.05
Project Location:Yanting City, Sichuan Province
Project Introduction:1. One main screen on the front, 1DJ platform 2. Skyscreen square layout 3. Square screen around.
-
Guangdong Yangjiang bar
Project Name:Guangdong Yangjiang bar
Project Date:2021.05
Project Location:Yangjiang City, Guangdong Province
Project Introduction:1. There is a main screen on the front and a DJ Table 2 Two ring screen 3 Long screen around.
-
Shijiazhuang gymnasium, Hebei Province
Project Name:Shijiazhuang gymnasium, Hebei Province
Project Date:2021.01
Project Location:Shijiazhuang
Project Introduction:1. Main screen 4096 × one thousand one hundred and twenty × 2. Strip screen
-
Hubei Kongjing KTV Party Room
Project Name:Hubei Kongjing KTV Party Room
Project Date:2022.05
Project Location:Wuhan, Hubei Province
Project Introduction:Multiple screens realize scene linkage.