Project Name | Sichuan Yuechi Bar | Project Introduction | 1. Two secondary screens on the side, with a DJ table. 2. Circular distribution on the top |
---|---|---|---|
Project Date | 2022.07 | Equipment used | KLS12*2、LS8、G612*148 |
Project Location | Yuechi County, Sichuan Province | Project Requirements | 1. One computer for centralized control. 2. Smooth playback without jamming, clear and smooth picture quality. |
View all cases
-
Nanjing garden city happy blue sea cinema
Project Name:Nanjing garden city happy blue sea cinema
Project Date:2019.12
Project Location:Nanjing
Project Introduction:KS9000、S2、G612、F2
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.09
Project Location:Xigaze, Tibet
Project Introduction:1. There is a main screen on the front and a DJ console on both sides of the main screen The top surface is an annular screen composed of 8 arcs, and both the inner and outer arcs have screens; There is also a spherical screen in the middle of the sky cur
-
Shenling ring, Foshan, Guangdong
Project Name:Shenling ring, Foshan, Guangdong
Project Date:2022.04
Project Location:Foshan, Guangdong
Project Introduction:1. Three trapezoidal modules; 2. Load with sv8p + g616c; 3. One box and one card
-
Hubei enshi Athena bar
Project Name:Hubei enshi Athena bar
Project Date:2020.01
Project Location:Enshi
Project Introduction:
-
Inner Mongolia Baotou Jiuqu Hotel
Project Name:Inner Mongolia Baotou Jiuqu Hotel
Project Date:2021.05
Project Location:Baotou, Inner Mongolia
Project Introduction:Indoor P4 main screen 2304 × 1024, auxiliary screen 640 × one thousand and twenty-four × 2 wave screen 13248 × six hundred and forty.
-
Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Name:Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Date:2021.05
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Ten Rubik's cube screens are displayed on three sides at the bottom of the front and back, with a total of 26 sides.
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Penglai Space bar
Project Name:Penglai Space bar
Project Date:2020.01
Project Location:Penglai
Project Introduction:Various different screens display 2, P4 modules independently, high refresh, do rotation, with HUB port offset.
-
Guangxi Baise Garden Expo
Project Name:Guangxi Baise Garden Expo
Project Date:2020.11
Project Location:Guangxi
Project Introduction:Three screens on the left, middle and right + floor tile screen, showing a complete picture on four sides