| Project Name | Gansu Baiyin cultural and creative center | Project Introduction | 1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen. |
|---|---|---|---|
| Project Date | 2020.12 | Equipment used | Kommander F2*2、ES4*42、KS9000、 KS8000、G628*147、G612*810 |
| Project Location | Baiyin City, Gansu Province | Project Requirements | 1. Centralized control by one computer; 2. Play smoothly without jamming, and the picture quality is clear and smooth. |
View all cases
-
The fourth people's hospital of guizhou
Project Name:The fourth people's hospital of guizhou
Project Date:2020.01
Project Location:Guizhou
Project Introduction:P2.5,3200x1152
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Shanghai Baoshan hotel lobby
Project Name:Shanghai Baoshan hotel lobby
Project Date:2021.08
Project Location:Baoshan District, Shanghai
Project Introduction:Thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front