| Project Name | National phosphorus resources development and Utilization Engineering Technology Research Center | Project Introduction | 1. A horn cylindrical screen in the exhibition hall of the research center |
|---|---|---|---|
| Project Date | 2021.03 | Equipment used | KBS1800,R12*100 |
| Project Location | Yunnan | Project Requirements | The project is a horn cylindrical screen of the national phosphorus resources development and utilization engineering technology research center. The special-shaped plate is required to achieve point-to-point display, upper screen and ring display. Under |
View all cases
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Skyscreen strip screen, display custom material, set off the environment display
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200
-
Gansu Baiyin cultural and creative center
Project Name:Gansu Baiyin cultural and creative center
Project Date:2020.12
Project Location:Baiyin City, Gansu Province
Project Introduction:1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control