| Project Name | Shenyang wedding hotel | Project Introduction | Nine door screens and one canopy |
|---|---|---|---|
| Project Date | 2020.01 | Equipment used | kommander F2,S8,KS8000,G616 |
| Project Location | Shenyang | Project Requirements | Good. There's a linkage between the screens |
View all cases
-
Nanjing garden city happy blue sea cinema
Project Name:Nanjing garden city happy blue sea cinema
Project Date:2019.12
Project Location:Nanjing
Project Introduction:KS9000、S2、G612、F2
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.
-
Circular screen of industrial and Commercial Bank of China
Project Name:Circular screen of industrial and Commercial Bank of China
Project Date:2021.03
Project Location:Beijing
Project Introduction: Special-shaped splicing
-
Shougang international qinhuangdao logistics base
Project Name:Shougang international qinhuangdao logistics base
Project Date:1970.01
Project Location:Qinhuangdao
Project Introduction:Full screen 22 transparent screen, need full screen display screen, shooting effect is good.
-
Hebei Cangzhou Nanpi radio and television station
Project Name:Hebei Cangzhou Nanpi radio and television station
Project Date:2021.12
Project Location:Cangzhou City, Hebei Province
Project Introduction:A total of 22 screens to achieve full point-to-point display
-
Spherical screen of a screen factory in Shenzhen
Project Name:Spherical screen of a screen factory in Shenzhen
Project Date:2020.09
Project Location:Shenzhen
Project Introduction:The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules.
-
Guizhou Daozhen bar
Project Name:Guizhou Daozhen bar
Project Date:2021.01
Project Location:Daozhen County, Guizhou
Project Introduction:1. One main screen on the front, vertical bar screen on the side, and multiple triangular screens on the ceiling.
-
Liaoning Anshan Tavern
Project Name:Liaoning Anshan Tavern
Project Date:2021.07
Project Location:Anshan, Liaoning
Project Introduction:Anshan tavern is equipped with several special-shaped screens with different shapes.
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.