

Project Name | Haier group international exhibition hall | Project Introduction | Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time. |
---|---|---|---|
Project Date | 2018.09 | Equipment used | KS938,S900,Z3 ,KS928,Kommander F2 |
Project Location | Shandong | Project Requirements | Hd display |
View all cases
-
Guangzhou Biological Island Exhibition Hall
Project Name:Guangzhou Biological Island Exhibition Hall
Project Date:2020.07
Project Location:GuangZhou
Project Introduction:Immersive project, wall resolution 4864*1408, left and right secondary resolution 1024*1408, ground resolution 4864*1024
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Anhui Lu'an iron and Steel Co., Ltd
Project Name:Anhui Lu'an iron and Steel Co., Ltd
Project Date:2020.11
Project Location:Anhui
Project Introduction:The wall screen can be divided or combined, and the picture quality is clear and smooth.
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Name:Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Date:2020.07
Project Location:DaQing
Project Introduction:P4, 12320*1520, 13 screens open at the same time, and switch and play
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280