

Project Name | Jiangsu century edge wedding Art Center | Project Introduction | P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular |
---|---|---|---|
Project Date | 2020.03 | Equipment used | KLS24,G612C*131 |
Project Location | Jiangsu | Project Requirements | 1. The screen of the project is semicircular, and the transmitted image is required to be clear without frame loss and flicker. 2. The camera has no scanning line, and the overall equipment is stable, which perfectly meets the project needs of the user. |
View all cases
-
Bright investment wisdom City some exhibition center
Project Name:Bright investment wisdom City some exhibition center
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:LED screen 1 L type 1536* 2432,12 LCD, 1 projection, 2 audio, HDMI to SDI converter
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Jiangsu Greenland ideal city exhibition hall
Project Name:Jiangsu Greenland ideal city exhibition hall
Project Date:2020.09
Project Location:Jiangsu
Project Introduction:P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
Shenzhen Futian Financial Innovation Center
Project Name:Shenzhen Futian Financial Innovation Center
Project Date:2021.06
Project Location:Futian District, Shenzhen
Project Introduction:An approximate 8K screen