

Project Name | Jiangsu century edge wedding Art Center | Project Introduction | P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular |
---|---|---|---|
Project Date | 2020.03 | Equipment used | KLS24,G612C*131 |
Project Location | Jiangsu | Project Requirements | 1. The screen of the project is semicircular, and the transmitted image is required to be clear without frame loss and flicker. 2. The camera has no scanning line, and the overall equipment is stable, which perfectly meets the project needs of the user. |
View all cases
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
An exhibition hall in Hangzhou
Project Name:An exhibition hall in Hangzhou
Project Date:2020.07
Project Location:Hangzhou, Zhejiang Province
Project Introduction:P1.53 Small spacing immersive experience hall
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Weihai Free Trade Zone Customs exhibition hall
Project Name:Weihai Free Trade Zone Customs exhibition hall
Project Date:2021.03
Project Location:Shandong
Project Introduction:1. Immersive 4-sided screen 2 Front screen: 1792 * 1536 left and right screens: 1024 * 1536 ground screen: 1792:1024
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Guizhou Geological Museum
Project Name:Guizhou Geological Museum
Project Date:2022.06
Project Location:Guiyang City, Guizhou Province
Project Introduction:There are three screens, a tunnel screen, a three fold screen on the wall and a conventional screen, all of which are P2 modules.