Project Name | Shenzhen Nanshan site Beiyou Technology Building | Project Introduction | P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate. |
---|---|---|---|
Project Date | 2021.08 | Equipment used | KBS1800*3、R12*200 |
Project Location | Shenzhen City, Guangdong Province | Project Requirements | 1. Custom point-to-point on-screen display of graphics card 2. Material customization immersive video on screen |
View all cases
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name:Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Name:Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Date:2020.07
Project Location:DaQing
Project Introduction:P4, 12320*1520, 13 screens open at the same time, and switch and play
-
China military museum
Project Name:China military museum
Project Date:2020.01
Project Location:Beijing
Project Introduction:Four cylinder screens, divided into two large cylinders and two small cylinders