
Project Name | Fujian Xiamen International Center | Project Introduction | Vertical arc screen |
---|---|---|---|
Project Date | 2022.02 | Equipment used | KS9000、S4*6、G616C*100 |
Project Location | Xiamen City, Fujian Province | Project Requirements | 1.P1. 53 vertical arc screen with clear picture display. 2. Play smoothly without jamming. |
View all cases
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
Immersive exhibition hall of Jiangxi Guangfeng Convention and Exhibition Center
Project Name:Immersive exhibition hall of Jiangxi Guangfeng Convention and Exhibition Center
Project Date:2022.06
Project Location:Shangrao City, Jiangxi Province
Project Introduction:1. Five screen immersive point-to-point display2
-
Henan Luoyang science and Technology Museum
Project Name:Henan Luoyang science and Technology Museum
Project Date:2021.04
Project Location:Luoyang, Henan
Project Introduction:Science and technology exhibition hall in the museum, P2 5-icnd2038s-5958, special-shaped plate and conventional version
-
Jiaoling longevity of the township some exhibition hall
Project Name:Jiaoling longevity of the township some exhibition hall
Project Date:2020.07
Project Location:MeiZhou
Project Introduction:One round awning 2496*2496, seven modeling screens 1760*270/1760*270/2112*330/2112*330/2640*420/2640*420/2640*420 *420
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
-
An exhibition hall in dongguan
Project Name:An exhibition hall in dongguan
Project Date:2020.01
Project Location:Dongguan
Project Introduction:Indoor P2.5 project, trapezoidal screen