Project Name | Weihai Free Trade Zone Customs exhibition hall | Project Introduction | 1. Immersive 4-sided screen 2 Front screen: 1792 * 1536 left and right screens: 1024 * 1536 ground screen: 1792:1024 |
---|---|---|---|
Project Date | 2021.03 | Equipment used | KS8000,ES4*6,G612C*88 |
Project Location | Shandong | Project Requirements | 1. The project requires four screens to be connected into a complete picture for point-to-point display. 2. The ks8000 video splicer has a multi picture opening display, which plays smoothly without jamming, and the image quality is clear and complete. |
View all cases
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
An exhibition hall in Hangzhou
Project Name:An exhibition hall in Hangzhou
Project Date:2020.07
Project Location:Hangzhou, Zhejiang Province
Project Introduction:P1.53 Small spacing immersive experience hall
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
Henan Luoyang science and Technology Museum
Project Name:Henan Luoyang science and Technology Museum
Project Date:2021.04
Project Location:Luoyang, Henan
Project Introduction:Science and technology exhibition hall in the museum, P2 5-icnd2038s-5958, special-shaped plate and conventional version