

Project Name | Exhibition hall of bonded port area | Project Introduction | 1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display. |
---|---|---|---|
Project Date | 2020.12 | Equipment used | Kommander F2*2 |
Project Location | Ningbo City, Zhejiang Province | Project Requirements | 1. Approximate point-to-point display, and the display screen has no tensile deformation; 2. Simple operation and visual editing; 3. The slide screen is displayed separately. |
View all cases
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed
-
Heilongjiang Heihe huma TV studio
Project Name:Heilongjiang Heihe huma TV studio
Project Date:2021.03
Project Location:Heilongjiang
Project Introduction:One main screen on the front and one ear screen on both sides.
-
Shenzhen Futian Financial Innovation Center
Project Name:Shenzhen Futian Financial Innovation Center
Project Date:2021.06
Project Location:Futian District, Shenzhen
Project Introduction:An approximate 8K screen
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Gansu Baiyin cultural and creative center
Project Name:Gansu Baiyin cultural and creative center
Project Date:2020.12
Project Location:Baiyin City, Gansu Province
Project Introduction:1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen.
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name:Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Circular screen, using modeling and video to create 3D effect
-
Jiangsu century edge wedding Art Center
Project Name:Jiangsu century edge wedding Art Center
Project Date:2020.03
Project Location:Jiangsu
Project Introduction:P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular
-
Shanghai Baoshan hotel lobby
Project Name:Shanghai Baoshan hotel lobby
Project Date:2021.08
Project Location:Baoshan District, Shanghai
Project Introduction:Thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens