

Project Name | Exhibition hall of bonded port area | Project Introduction | 1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display. |
---|---|---|---|
Project Date | 2020.12 | Equipment used | Kommander F2*2 |
Project Location | Ningbo City, Zhejiang Province | Project Requirements | 1. Approximate point-to-point display, and the display screen has no tensile deformation; 2. Simple operation and visual editing; 3. The slide screen is displayed separately. |
View all cases
-
Southeast smart city, Shijiazhuang City, Hebei Province
Project Name:Southeast smart city, Shijiazhuang City, Hebei Province
Project Date:2021.07
Project Location:Shijiazhuang City, Hebei Province
Project Introduction:Three outdoor screens, a transparent screen, two grille screens and a super large sky screen.
-
Exhibition Hall of Jingyu Industry Co., Ltd
Project Name:Exhibition Hall of Jingyu Industry Co., Ltd
Project Date:2022.07
Project Location:Shanghai
Project Introduction:1.5 conventional LED screens 2.1 three side immersion 3.1 LCD screens 4.2 column screens
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Guangdong Qingyuan Rocky Desert Park Science Popularization Center
Project Name:Guangdong Qingyuan Rocky Desert Park Science Popularization Center
Project Date:2022.04
Project Location:Qingyuan City, Guangdong
Project Introduction:1. An arc strip screen with a resolution of 12160 * 1536
-
Ziyang Yagu science and Innovation Park
Project Name:Ziyang Yagu science and Innovation Park
Project Date:2021.03
Project Location:Sichuan
Project Introduction:The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point.
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.