Project Name | Xi 'an national digital publishing house | Project Introduction | The home screen2816*512 |
---|---|---|---|
Project Date | 2018.11 | Equipment used | KS600 Kommander Z3 |
Project Location | Xi 'an | Project Requirements |
View all cases
-
Heilongjiang Heihe huma TV studio
Project Name:Heilongjiang Heihe huma TV studio
Project Date:2021.03
Project Location:Heilongjiang
Project Introduction:One main screen on the front and one ear screen on both sides.
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Circular screen, using modeling and video to create 3D effect
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Yunxi Chaohui, Changsha City, Hunan Province
Project Name:Yunxi Chaohui, Changsha City, Hunan Province
Project Date:2022.10
Project Location:Changsha City, Hunan Province
Project Introduction:A total of 3 large outdoor advertising screens, with an overall resolution of over 8K.
-
Baotou City Planning Exhibition Hall
Project Name:Baotou City Planning Exhibition Hall
Project Date:2021.12
Project Location:Inner Mongolia
Project Introduction:Separate scene, inner arc projection fusion
-
An exhibition hall in Hangzhou
Project Name:An exhibition hall in Hangzhou
Project Date:2020.07
Project Location:Hangzhou, Zhejiang Province
Project Introduction:P1.53 Small spacing immersive experience hall
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front